PT. PAMA Persada Nusantara (PAMA)
  • Fleet Management System Implementation at Kideco Mine Site (350 units)
  • SNC MineComms Wireless network to support the Fleet Management System Implementation at Kideco Mine Site
  • High Precision Drill Management system installed on 6 Drills at Kideco Mine Site
  • Coal Long Hauling Fleet Management System (120 units) and SNC MineComms WiFi and GPRS Network design and implementation at PAMA Bontang site
  • Light Vehicle GPS tracking project at PAMA Bontang (250 units)
  • On-site Support and Maintenance Project at PAMA Kideco, PAMA ABKL, PAMA Jembayan, PAMA Bontang and PAMA TCMM Melak (2014)
  • PAMA Adaro site – design, supply, installation of the SNC MineComms Communications network covering the complete PAMA Mine Operations at Adaro site including stage no1 34 portable towers and 6 fixed towers which is now being extended to include the new PAMA operations area at Adaro. The total MineComms network will includes over 75 portable transmission towers and 12 fixed towers with a total Wifi coverage area of over 43 km2 supporting over 500 HD Trucks and excavators and over 40 other Auxiliary units across the PAMA Adaro site operations.
PT. ADARO Tbk
  • SNC MineComms Wireless network to support the Fleet Management System Implementation at SIS Adaro Site (additional networks to support the SIS network for the Adaro group)
  • SNC Technologies is currently designing the Adaro SNC MineTrack VHF LongHaul fleet of over 350 Coal LongHaul trucks over its 90 km pit to port haul.
PT. Sapta Indra Sejati (SIS)
  • Fleet Management System Implementation at Adaro Mine Site (320 vehicles)
  • SNC MineComms wireless network expansion project at Adaro Mine Site. Stages 1, 2, 3 and 4 (networking of 4 separate mining areas across the Adaro site) 
  • FMS and SNC MineComms on-site Support and Maintenance project
  • High Precision Drill Management system installed on 2 Drills at Adaro Mine Site
  • High Precision Excavator and Dozer Management system installed on 2 Excavators and 4 Dozers at Adaro Mine Site
PT.  Petrosea Tbk
  • Fleet Management System Implementation at Gunung Bayan Site
  • SNC MineComms Wireless network to support the FMS Implementation at Gunung Bayan Site
  • Fleet Management and SNC MineComms Maintenance project (10 months)
  • Trial Implementation of the SNC MineLink FMS system at their ABN site for 2 fleets along with the design and supply of the SNC MineComms system to support the MineLink FMS trial with further implementation after the trial period.
PT. Kitadin Tandung Mayang
  • Fleet Management System Implementation at Indominco Site (125 units)
  • High Precision Drill Management system installed on 6 Drills at Indominco site
  • SNC MineComms Wireless network to support the FMS Implementation at Indominco Site
  • FMS and MineComms On-site support and maintenance project
PT. Leighton Contractors Indonesia
  • Fleet Management System Implementation at Wahana Site (250 vehicles)
  • SNC MineComms Wireless network to support FMS Implementation at Wahana Site
  • FMS and SNC MineComms on-site Support and Maintenance project
  • SNC MineTrack VHF Coal LongHaul Fleet Management system development and implementation on 55 coal haulers over a 60km haul road utilizing VHF communications protocol Project at MGM site. The SNC MineTrack LongHaul Fleet Management system utilizes the MineLink FMS platform.
PT. Kideco Jaya Agung
  • CCTV project since 2008 until 2013 (5 stages) with a total of 67 CCTV cameras networked throughout the entire mine site including stations at mine site locations, loading port and stockpiles. The system includes a 12 Screen LCD real time monitoring station and recording system.
  • SNC MineComms to support the CCTV Camera network